QAPCO prioritizes the safety and wellbeing of its employees and contractor partners through an integrated Health, Safety, Environment, & Quality (HSEQ) management. Protecting our workforce is a primary goal and we do our best to avert any injuries and first aid incidents.
Therefore we consider our partnerships with the contractors partners a top priority and the foundation of having a high safety performance. We work closely with our contractors to ensure they are well informed about rules to be followed and adequately trained.
HSEQ Contractors Safety Procedures
- Contractor Safety Rules & Regulations
- Contractor Worker – Training Matrix
- Contractor Training Room Rules
- Contractor Safety Management Procedure
- PR-SO-02-F03 / HSE Performance Report
- PR-SO-02-F02 / QAPCO – HSE Variance Request Form
- PR-SO-02-F01 / Bidder-HSE Performance Assessment
- PR-SO-02-CL04 / HSE Post Contractor Evaluation
- PR-SO-02-CL03 / Contractor HSE Evaluation-V0.16
- PR-SO-02-CL02 / Contractor yard HSE Audit Checklist-V1.0
- PR-SO-02-CL01 / HSE Plan Mobilization Audit Checklist
- PR-SO-02-AP07 / Instructions for Contractor Evaluation Reporting by CSM 6-step Coordinator
- PR-SO-02-AP06 / Instructions for Periodic Evaluation by Auditor
- PR-SO-02-AP05 / Instructions for Worker Evaluation for Auditor
- PR-SO-02-AP04 / List of Contractor Communication Initiatives V0.1
- PR-SO-02-AP03 / HSE Plan Requirements
- PR-SO-02-AP02 / List of HSE Regulations and Procedures 0.2
- PR-SO-02-AP01 / HSE Service Provider Database Template
- OT-SO-001 / QAPCO 12 Golden Rules
- IN-250-HSE-06 / HSE Guideline for Doha HQ
- IN-250-HSE-07 / Cold Work Permit
- IN-250-HSE-08 / Hot Work Permit
- IN-250-HSE-09 / Confined Space Work Entry
- IN-250-HSE-10 / Excavation Certificate Instruction
- IN-250-HSE-12 / Radiography Certificate Instruction
- IN-250-HSE-13 / Instruction for Lifting activities
- IN-250-HSE-14 / HSE Instruction Electrical Isolation De-Isolation
- IN-250-HSE-16 / Safe Working at Height
- IN-250-HSE-17 / HSE Guideline for Traffic Pedestrian
- IN-250-HSE-21 / Radioactive Materials
- IN-250-HSE-23 / Guidelines for Lockout Tagout and Try-LT-T
- IN-250-HSE-24 / Instruction for Pipeline Cutting Location Identification
- IN-250-HSE-28 / Positive Isolation for piping and equipment
- IN-251-SF-04 / Instruction for using Intrinsic Safe Mobile Phone-1
- IN-SE-01 / Heat Stress Management Instruction
- IN-253-ENV-02 / Env Protection in QAPCO Contractor & Suppliers
- IN-253-ENV-07 / Occup. Health Industrial Hygiene Instruction for Contractors
- IN-253-ENV-09 / Benzene Control Program
- IN-254-SCR-04 / Material Exit Pass Instruction
- IN-254-SCR-06 / Photography in QAPCO Mesaieed Facility
- IN-ST-09 / Abnormal Load Hazardous Material Transport.
- IN-255-FF-08 / Guideline for using QAPCO-SCBA
- IN-301-INT-220/ Technical Instruction Golden Joints
- IN-310-MED-01 / QAPCO Clinic Management Instruction
- PR-210-MN-15 / Flanged Connections Procedure
- PR-250-HSE-02 / PPEs Management
- PR-250-HSE-05 / HPWC-HSE Procedure
- PR-250-HSE-06 / Hose Management Procedure
- IN-250-HSE-28 / Positive Isolation for pipping and equipment
- PR-SE-01/ Management Safety Data Sheet
- PR-253-ENV-03 / Industrial Hygiene Expo Monitoring
- PR-253-ENV-04 / Hearing Conservation Program
- PR-310-MED-02 / Fitness To Work Procedure
- PR-SO-001 / Investigation and Reporting of HSSE events
- PR-PSS-111 / Appropriated Reaction Procedure
- PR-PSS-112 / Procedure for Safety Walk
- PR-PSS-114 / Work Permit Procedure
- PR-PSS-123 / Waste Management Procedure
- PR-PSS-127 / JSA Procedure
- PR-ST-001 / Mesaieed Facilities Access Control Procedure
- PR-ST-002 / GATE PASS Procedure
- IN-218-GS-02 / Instructions For Contractors’ Yard, Temporary Facilities & Laydown Areas
”Contractors Training Request & Approval Form” to download